PAST PROJECTS


RETAIL DRIVE INTERSECTION/REALIGNMENT
2024-2025
Starting in November 2024, up until fall of 2025, Galbraith Construction completed all civil infrastructure and resurfacing to realign Retail Drive's intersection with Ashburn Lake road and Rothesay Avenue.
PORT SAINT JOHN SLIP INFILL & FINISHING WORKS A&B
Galbraith Construction has played an intricate and important role in the Enhanced Westside Terminal Modernization project. Key involvement included: demolition of surface features and mass excavations, storm water drainage and watermain installation, site grading and asphalt placement.








CITY OF SAINT JOHN STREET RECONSTRUCTION
Galbraith Construction has been the general contractor for various full street reconstructions throughout the Uptown area; including storm and sewer main separations, watermain relocations/extensions, concrete curb and sidewalk installation, and asphalt paving.
SAINT JOHN GENERAL HOSPITAL DEMOLITION
In December 1995, Galbraith Construction successfully demolished the Saint John General Hospital by a controlled implosion and debris removal. Galbraith Construction is and has been heavily involved in demolition work.






NORTH END TRUCK SEWER EMERGENCY REPAIR
Following the collapse of the north-end truck sewer in 1992, Galbraith Construction was able to complete an emergency repair on the 8ft box culvert, successfully having the sewer fully functioning as soon as possible.

